Afbeelding van de auteur.
328 Werken 894 Leden 40 Besprekingen

Over de Auteur

Fotografie: By General Electric Company - w:File:General_Electric_logo.svg, Public Domain, https://commons.wikimedia.org/w/index.php?curid=27500759

Reeksen

Werken van General Electric

Cooking With a Food Processor (1978) 69 exemplaren
The silent hostess treasure book (1930) 21 exemplaren
The Convection Oven Cookbook (2002) 21 exemplaren
The Microwave Cookbook (1993) 21 exemplaren
GE transistor manual (1959) 17 exemplaren
GE Transistor Manual, 7th Ed. (1964) 12 exemplaren
The New Art of Modern Cooking (1937) 10 exemplaren
The New Art (1937) 8 exemplaren
Software Engineering Handbook (1985) 4 exemplaren
Plan Growth Lighting 3 exemplaren
The story of the lamp 2 exemplaren
Food In Focus 2 exemplaren
Cookery Book 2 exemplaren
Wiring 1 exemplaar
Catalogue 1 exemplaar
Missile Facts. 1 exemplaar
G.E.C Cookery book 1 exemplaar
Transistor manual 1 exemplaar
Manager development 1 exemplaar
Lamp Products Catalog 2006 (2001) 1 exemplaar
Photo Data Book (GEL-624A) (1945) 1 exemplaar
Home Economics 808 1 exemplaar
ABCs of Radio, The 1 exemplaar
the hanford story 1 exemplaar
Automatic Skillet 1 exemplaar
It Takes Experience 1 exemplaar
X ray studies 1 exemplaar
PRIMEIROS SOCORROS 1 exemplaar
GE Glow Lamp Manual 1 exemplaar
GE portable mixer 1 exemplaar
GE Money Brochure 1 exemplaar
Jet Service News 1 exemplaar
Arc welding manual 1 exemplaar
GE Home Library 1 exemplaar

Tagged

Algemene kennis

Gangbare naam
General Electric
Geboortedatum
1892-04-15
Geslacht
n/a
Nationaliteit
United States of America

Leden

Besprekingen

Superb folding colour plate of 42 types of lamp produced the Osram-G.E.C. lamp works, Hammersmith - and many other black and white photos throughout the text.
 
Gemarkeerd
jon1lambert | Feb 20, 2023 |
ABSTRACT:
The Interim results of a program to develop sodium-sulfur batteries for utility load-leveling applications are presented in this report. The reporting period is October 1977 through May 1979. The accomplishments of the Laboratoires de Marcoussis of the Compagnie Generale d'Electricite, France, while under subcontract to General Electric, are included.

During this report period a major scale-up to the first full-size (615 mm x 49.3 mm OD, 168 Ah) cells was accomplished. Safety tests demonstrated the need for a safety insert for the sodium to limit the rate sodium and sulfur could react in the event of a beta tube failure. Performance testing demonstrated a cell capacity greater than the 168 Ah design value, but the electrical resistance was approximately 30% greater than the design value.

Two concepts for a 100 kWh battery module were investigated. The first uses forced-convection nitrogen cooling. The second uses liquid organic coolant and is more compact, less costly and provides better temperature control. However, the organic coolant design introduces potential fire hazards and corrosion concerns. These studies are continuing.
… (meer)
 
Gemarkeerd
SandiaCSP | Nov 22, 2022 |
ABSTRACT:
Prior studies have shown that one of the methods that may have near-term potential for generating peaking power by electric utilities is to store thermal energy during low demand periods to produce electricity during high demand periods. The objective of this study is to identify potential concepts, select the most promising ones for conceptual design and make detailed evaluations of their economic feasibility and cost-benefits. Over forty concepts were examined for storage media, forms of containment, and cycle configurations for con- version to electricity.

An extensive analysis and screening process resulted in selecting two coal-fired and two nuclear plants for detailed conceptual design. The coal plants utilized peaking turbines and the nuclear plants varied the feedwater extraction to change power output.

It was shown that the performance and costs of even the best of these systems could not compete in near-term utility applications with cycling coal plants and typical gas turbines available for peaking power. Lower electricity costs, greater flexibility of operation, and other benefits can be provided by cycling coal plants for greater than 1500 hours of peaking or by gas turbines for less than 1500 hours if oil is available and its cost does not increase significantly.
… (meer)
 
Gemarkeerd
SandiaCSP | Nov 22, 2022 |
ABSTRACT:
This Midterm Technical Report documents progress during the first year of the Alternate Central Receiver Power System Program Phase II (DOE Contract No. DE-AC03-79SF10535). The report consists of the following three volumes:

• Volume I - Commercial Plant Design Refinement
• Volume II - Sodium Test Receiver Experiment
• Volume III - Materials Experiments
 
Gemarkeerd
SandiaCSP | Nov 11, 2022 |

Misschien vindt je deze ook leuk

Gerelateerde auteurs

Statistieken

Werken
328
Leden
894
Populariteit
#28,653
Waardering
½ 3.3
Besprekingen
40
ISBNs
18
Talen
2

Tabellen & Grafieken